Edmantium

For buyers

MOQ & lead times

Both are set per category, both are read off the published catalogue below, and neither is one number for the whole range.

Minimums are 5,000 pieces for festive & seasonal, candle holders & jars, tableware & decor, jars & kitchen storage and bottles & bath; 50 pieces for lighting & ambience — per design and per colour, because each is its own production run. One glass design in several colours is 15,000 pieces in all, with 5,000 the floor for each colour in the mix. Production takes 45–90 days from order confirmation to goods ready at the factory, and sea freight sits on top of that, quoted per lane. The table is the whole answer; everything under it is why.

By category

Minimum order quantity, production lead time and HS code by category
CategoryPublished itemsMOQ per designProductionHS code
Festive & Seasonal955,000 pcs45 – 60 days7013.99, 9505.10, 9505.90
Candle Holders & Jars995,000 pcs45 – 60 days9405.50
Lighting & Ambience1150 pcs60 – 90 days—
Tableware & Decor105,000 pcs45 – 60 days7013.37, 7013.49, 7013.99
Jars & Kitchen Storage95,000 pcs45 – 60 days7010.90, 7013.49
Bottles & Bath65,000 pcs45 – 60 days7010.90, 7013.99

Read from published products, so this table can only ever show a minimum something is actually sold at. Minimums are per design and per colour. Lead time runs to goods ready at the factory and excludes sea freight.

Why the minimum moves

A minimum order quantity is not a sales policy, it is a production fact. Glass is made in runs: the furnace, the mould and the finishing line are set up once and then run. The minimum is the point below which the setup costs more than the goods.

So it moves with how a piece is made, not with how much we would like to sell. Every glass line sits at the same 5,000, because the constraint is the same one: a single colour, a single run of the mould. Lighting sits far lower, at 50, because the value per piece is higher and the glass is one component of several in an assembled fitting. The expensive case is one design wanted across several colours: each colour is batched separately, which is why the total is 15,000 rather than 5,000.

Ordering several items together usually helps more than raising the quantity of one. A mixed container spreads the same freight and handling across more lines.

What lead time means here

Lead time runs from order confirmation to goods ready at the factory. It does not include sea freight, and we will not quote you one number that hides it — transit varies by lane and by season, and a combined figure is one you cannot plan against. Per-destination detail is on the export market pages.

Two things move it more than quantity: a new mould, and a finish applied by hand. Both are worth flagging in your first message so the quote is right the first time.

Seasonal ordering

Christmas is the sharp case. The buying season for festive glass runs months ahead of December, and the factory is at its busiest exactly when late orders arrive. If your season is Q4, the conversation belongs in the first half of the year.

Buyer questions

What is the minimum order quantity?
5,000 pieces for festive & seasonal, candle holders & jars, tableware & decor, jars & kitchen storage and bottles & bath; 50 pieces for lighting & ambience. Minimums are per design and per colour, because each is a separate production run. One glass design in several colours is 15,000 pieces in all, with 5,000 the floor for each colour in the mix.
How long does production take?
45–90 days from order confirmation to goods ready at the factory, depending on the category. Sea freight is on top of that and is quoted separately per lane.
Can I mix designs to reach the minimum?
No — the minimum is per design, because each design is its own run of the mould. Colours of one design do combine, and that is what the 15,000-piece total is for. Ordering several designs together is usually cheaper per piece than raising the quantity of one, since a mixed container spreads the same freight and handling across more lines.
Does the minimum change if I want a custom colour?
Each colour is its own furnace run, so the minimum is per colour rather than per shape: 5,000 pieces for one colour, 15,000 in all if you want the design in several. A colour we are not currently running also has to be batched for your order, so say the colour in your first message and the quote comes back right the first time.
Do chandeliers have the same minimum as glassware?
No. Chandeliers, floor chandeliers and table chandeliers sit at 50 pieces per design and finish, the same as the rest of the lighting range and far below the glass minimum — a fitting is assembled from components rather than batched in a furnace run. Chandeliers are also the range where the quantity is usually set by a project rather than a reorder, and a hotel fit-out and a retail assortment are not the same job. Tell us the piece count the project actually needs and the quote comes back with the quantity and the schedule together.
Does the lead time include shipping?
No. Lead time ends when the goods are ready at the factory. Transit is separate because it varies by lane and by season, and we quote FOB, EXW, CIF, CFR so you can see which part of the cost is which.
When should I place a Christmas order?
In the first half of the year. The buying season for festive glass runs months ahead of December, and the factory is at its busiest exactly when late orders arrive — so a Q4 delivery is a Q1 or Q2 conversation.
What is the lead time for a sample?
Quoted per request rather than fixed, because a sample from an existing mould and a sample that needs one are not the same job. Samples are chargeable and the cost is credited against a production order.

Facts last reviewed